How it works
Working on the Rig
Every DFAB cabin is built in our Thane yard through the same 12 inspected stages, then craned onto site ready to use.
Run sheet
From raw steel to a finished cabin in 12 stages.
Every cabin moves through the same inspected sequence in our yard, so quality doesn’t depend on luck.
- 01
Order confirmed
Once we receive your official order, your project enters our production schedule.
- 02
Layout approval
Our engineers prepare layout options and refine them with you until you sign off.
- 03
Material cutting
Steel sections and sheets are cut precisely to the approved layout.
- 04
Structure fabrication
The frame is fabricated, the backbone that decides how long your cabin lasts.
- 05
Welding & waterproofing
Joints are welded and the shell is sealed so the cabin performs in every season.
- 06
Chemical cleaning & primer
Surfaces are chemically cleaned, then primed to protect against corrosion.
- 07
Concealed wiring
Electrical wiring is routed inside the walls and tested circuit by circuit.
- 08
Insulation & panelling
Thermal insulation goes in, followed by internal panels for a clean finish.
- 09
Lights, AC & sockets
Lighting, air-conditioning points and sockets are fitted to your plan.
- 10
Exterior painting
The outer body is painted in your approved colour scheme.
- 11
Finishing & cleaning
Interiors are finished and deep-cleaned so the cabin arrives ready to use.
- 12
Inspection & dispatch
Engineers inspect every detail before the cabin is dispatched to your site.
Inside the wall
Seven layers between your team and the weather.
Scroll to take a DFAB wall apart. Every layer is fitted in our Thane yard, so nothing is left to be finished on site.
- 01Profiled steel sheet
Weather skin, painted in your colour. Ribs add stiffness and shed rain.
- 02Welded steel frame
Posts, rails and studs carry the cabin when it is lifted, and a second storey when stacked.
- 03PUF insulation
Rigid polyurethane foam keeps heat out in summer and cuts outside noise.
- 04Concealed wiring
Conduits, switch and socket boxes run inside the wall and are tested before dispatch.
- 05Vapour barrier
Stops moisture reaching the insulation from inside the room.
- 06Interior panel
Clean, washable finish with switch plates and skirting fitted.
- 07Floor build-up
Ply deck on the steel base, finished in vinyl or tiles.